Center Beam Replacement 19th Century Post and Beam House, Harrison NY

Below are some progress photos depicting substructure reinforcement and temporary bearing beams for our project replacing a center truss girder on an early 19th century post and beam house in Harrison: NY.

IMG_1674
Cracked main girder in post and beam ceiling in 18th or early early Nineteeth century farmhouse Harrison NY

The house has been heavily modified over the years and it appears that in a circa 1980s renovation a load bearing central truss was cut out leaving only a single undersized beam to bear floor wall and roof loads on an approximately 30′ x 17′.  The old hardwood beam cracked under the load and is being replaced by a new solid white oak beam with a pair of steel angles inserted from the top for reinforcement.

I will publish details of this as the work proceeds.

Temporary beams in place
Temporary load bearing beams support floor before removal of cracked center girder. It is my supposition that the rod seen in the first photo attached to a structural truss. Sloppy renovators in the 1980’s modified the roof line and  seem to have cut out the upper section of the truss and rod leaving this beam alone to carry much of the second floor of the house.

Photo group below shows shoring and reinforcement in the basement and crawl space areas in preparation for jacking the floor level above.

Harrison Truss Rod

All Photography by Benjamin Fiering. Reproduction by permission only.
A Third Floor Project #Thirdfloor

 

1968 Deck House Restoration

April 2017: Pepper Pond Deck House (1968) restoration in progress, Sherman CT. Design by Barbara Eyler, Benjamin Fiering, Eli Weiner. A Third Floor Project #Thirdfloor #DeckHouse

photo by Ben Fiering

Pepper Pond K1 April 2017
Pepper Pond Deck House (Original construction 1968) restoration in progress, [Scope of work: replace footings and post piers, replace all posts, repair or replace deck substructure as needed, Remove and process, reclaim and replace decking. Handrail stanchions custom white oak. Cap rail reclaimed Mahogany. Roof built up and insulated to r, 50 Hunter Panel Polisosanurate insulation. Retrim roof. Add Copper gutter. Site work and drainage to come. ] April 2017. A Third Floor Corporation project. Design Team Barbara Eyler, Benjamin Fiering, Eli Weiner. Carpentry and structural repair by Gedi Bruce, Mathew Kane, Eli Weiner #Thirdfloor #Deck House
CropPepperPond
photo by Ben Fiering

Pepper Pond Deck House restoration Sherman CT. Credits as above.