1968 Deck House Restoration

April 2017: Pepper Pond Deck House (1968) restoration in progress, Sherman CT. Design by Barbara Eyler, Benjamin Fiering, Eli Weiner. A Third Floor Project #Thirdfloor #DeckHouse

photo by Ben Fiering

Pepper Pond K1 April 2017
Pepper Pond Deck House (Original construction 1968) restoration in progress, [Scope of work: replace footings and post piers, replace all posts, repair or replace deck substructure as needed, Remove and process, reclaim and replace decking. Handrail stanchions custom white oak. Cap rail reclaimed Mahogany. Roof built up and insulated to r, 50 Hunter Panel Polisosanurate insulation. Retrim roof. Add Copper gutter. Site work and drainage to come. ] April 2017. A Third Floor Corporation project. Design Team Barbara Eyler, Benjamin Fiering, Eli Weiner. Carpentry and structural repair by Gedi Bruce, Mathew Kane, Eli Weiner #Thirdfloor #Deck House
CropPepperPond
photo by Ben Fiering

Pepper Pond Deck House restoration Sherman CT. Credits as above.